• it
  • en
CECM

Award E.C.C.S. 1995

Viaduct on the "Grand Canal Maritime" at Le Havre

Erection, construction design and assembly equipments and launching of continuous bridge full-welded, 1400 meters long with central span arch frame of 275 meters

Le Havre

Jury assessment:

"This arch-shaped continuous girder bridge resulting from an evolution in design together with the composite action of the deck made it possible to cover a central span of 275 m. Carefully planned erection following the floating-in of large prefabricated steelparts contributed to the optimised design."